Projects

Northampton District High School

Coral Coast Homes & Construction
Northampton
Commencing June 2024

Read More

Geraldton Aboriginal Short Stay Accommodation

GBSC
Geraldton
Commencing April 2024
$3 million

Read More

Solar

Pacific Energy Renewables WA Pty Ltd
Midwest
Expected start date April 2024

Read More

CBH Power Upgrades

CBH
Mingenew, West Casuarinas and Binnu
Sep 23 to Dec 23
390k

Read More

Covalent Lithium Mine

Thiess
Mt Holland
Mar 23 to Aug 23
0.963m

Thiess have awarded the Electrical works for the non-processing Infrastructure at the Covalent Lithium Mine including workshops, bulk fuel facility, Wash Pad and Area Lighting. Works are expected to commence in Early Feb 2023.

Read More

Utakarra Softball Park Lighting Upgrade

Geraldton Softball Association Inc.
Geraldton
October 2022 (complete)
$100k

Geraldton Softball Association Inc engaged SKEC to design and install replacement lights for the 20m Lighting Towers at the oval. The new design decreased the lights required but increased the light levels and will reduce the Club’s ongoing power costs.

Read More

Mt Ida Gold Mine (Bottle Creek)

Aurenne Group Mining
Goldfields
Aug 22 – Feb 23
$4m

Aurenne Mining Group Mining in conjunction with Plant and Infrastructure Engineering have engaged S&K Electrical Contracting Pty Ltd to complete all electrical works for the non-processing infrastructure including a temporary camp, permanent camp, airfield, offices, workshops, warehouses, communications buildings and other works.

Read More

Geraldton Police Complex Upgrade

GBSC
Geraldton, WA
2017-2018
1.0m

Total refurbishment of the Geraldton Police Complex.

Read More

Kirkalocka Gold Mine

MACA Interquip
Mt Magnet, WA
2019
$1.6m

Gold Mine Upgrade including Primary Crusher installation.

Read More

Yandin & Warradarge Wind Farm

Decmil
Yandin & Warradarge Wind Farms Midwest
2020
0.6m

Non-Processing Infrastructure Electrical Small Power & Lighting, Power supply, UPS & Connections, Communications, HVAC, Fire & Security Systems.

Read More

Roy Hill Conveyor

DIAB Engineering
Roy Hill Mine Site, Newman
2020
4.0m

Our project consisted of all Electrical & Instrumentation works to be completed on the new 8km long Conveyor with integration into existing operations.

Read More

Corunna Downs / Sanjiv Ridge Iron Ore Mine

MACA Mining
Marble Bar, WA
2021
$0.75m

Non-Processing Infrastructure – all electrical works for the HMW Workshop & Domes, Administration Buildings, Wash Pad, Fuel Farm, Oily Water Separator and Generator compound.

Read More

Ravensthorpe Nickel

MACA Mining
Shoe Maker Levy Mine
2021
0.7m

Non-Processing Infrastructure – all electrical works for the HMW Workshop & Domes, Administration Buildings, Wash Pad, Fuel Farm and Oily Water Separator.

Read More

Paddington Gold Mine

MACA Interquip
Paddington Gold Mine, Kalgoorlie, WA
2021
0.9m

Pebble Crusher Circuit Upgrade at the Norton’s Paddington Gold Mine in Kalgoorlie.

Read More

Roy Hill Debottlenecking

DIAB Engineering
Roy Hill Mine Site, Newman
2021
6.5m

Award Finalist Industrial Project of the Year in 2022 (pending Final Awards) Project consisted of all Electrical & Instrumentation works.

Read More

King of the Hill Gold Mine

MACA Interquip
King of the Hill Gold Mine Leonora, WA
2021 - 2022
11.0m

Construction of Gold Mine completing all Electrical, Instrumentation, Communication and Fire works across the crushing, grinding, mill, leach & absorption, gold recovery, reagents, borefields and plant services areas.

Read More

Agnew Gold Mine Expansion Stage 1

Gold Fields
Agnew Gold Mine Leinster, WA
2022 - 2022
2.5m

Gold Fields and Lycopodium awarded the Electrical & Instrumentation package for its Agnew Gold Mine Expansion Project Stage 1 in May 2022. Works completed in late August 2022.

Read More

Karlawinda Gold Mine

Capricorn Metals Limited
South east of Newman
2020
1.337m

Karlawinda Gold Mine 320 person camp.

Read More

Thunderbox Gold Mine

Interquip Pty. Ltd.
Thunderbox Gold Mine
2016
0.21m

Supply labour and materials for the electrical, instrumentation, communications & air conditioning for the new Gravity Circuit Upgrade.

Read More

Monsignor Hawes Heritage Centre

Crothers Construction Pty Ltd
Geraldton WA
2015 - 2016
0.6m

Restoration, Conservation and Enhancement for the Twenty-First Century and beyond.

Read More

Midwest Port Authority CV03 & CV04 Conveyor Upgrade

Marine & Civil Pty. Ltd.
Midwest Ports, Geraldton
2016
0.9m

Supply labour and materials for the upgrade of CV03 & CV04 at Midwest Ports, Geraldton.

Read More

Kalbarri Beach Resort

Kalbarri Beach Resort Electrical & Airconditioning Upgrade
Kalbarri WA
2019 - 2020
1.0m

Kalbarri Beach Resort Electrical Upgrade

Read More

Lloyds Commercial Building

Coral Coast Homes
Meekatharra
2019-2020
0.25m

Commercial Re-development of the existing Lloyds Commercial Building. Premises consists of main entrance foyer, 6 x tenancies & public toilets with-in the complex. Project started 1/07/2019 and was completed 30/04/2020.

Read More

Blue Bird Camp HV Power Upgrade

Westgold Resources Limited
Blue Bird Gold Mine
2019-2020
0.15m

Camp power supply upgrade.

Read More

Blue Bird Secondary Crusher

Westgold Resource Limited
Blue Bird Gold Mine
2019
0.4m

Supply labour and materials for the new Secondary Crusher/Screen E&I at Blue Bird Gold Mine.

Read More

Gruyere Gold Mine

Downer EDI Mining Pty Ltd
Laverton, WA
2018 - 2019
1.1m

Supply labour and materials for the electrical, communication new Gruyere Gold Contractors Workshop/Sheds/Yard & Administration.

Read More

Iluka Resources Cataby Mineral Sands Project

DIAB Engineering
Cataby WA
2018 - 2019
12.0m

Construction of the Second Concentrator building, Process Water, Clean Water, Thickeners 1 & 2, Flocculant Mixing Area, HV LV wash down bays and Return Water.

Read More

Wiluna Shire Offices

Geraldton Building Services & Cabinets
Wiluna WA
2017-2018
0.51m

Commercial development of the existing Wiluna Hotel Lloyds to the new Shire of Wiluna Council Offices. Premises consists of council chambers, administration offices and commercial kitchen/function room. Project started 1/11/2017 and was completed 30/08/2018.

Read More