Northampton District High School
Covalent Lithium Mine
Thiess have awarded the Electrical works for the non-processing Infrastructure at the Covalent Lithium Mine including workshops, bulk fuel facility, Wash Pad and Area Lighting. Works are expected to commence in Early Feb 2023.
Utakarra Softball Park Lighting Upgrade
Geraldton Softball Association Inc engaged SKEC to design and install replacement lights for the 20m Lighting Towers at the oval. The new design decreased the lights required but increased the light levels and will reduce the Club’s ongoing power costs.
Mt Ida Gold Mine (Bottle Creek)
Aurenne Mining Group Mining in conjunction with Plant and Infrastructure Engineering have engaged S&K Electrical Contracting Pty Ltd to complete all electrical works for the non-processing infrastructure including a temporary camp, permanent camp, airfield, offices, workshops, warehouses, communications buildings and other works.
Geraldton Police Complex Upgrade
Total refurbishment of the Geraldton Police Complex.
Kirkalocka Gold Mine
Gold Mine Upgrade including Primary Crusher installation.
Yandin & Warradarge Wind Farm
Non-Processing Infrastructure Electrical Small Power & Lighting, Power supply, UPS & Connections, Communications, HVAC, Fire & Security Systems.
Roy Hill Conveyor
Our project consisted of all Electrical & Instrumentation works to be completed on the new 8km long Conveyor with integration into existing operations.
Corunna Downs / Sanjiv Ridge Iron Ore Mine
Non-Processing Infrastructure – all electrical works for the HMW Workshop & Domes, Administration Buildings, Wash Pad, Fuel Farm, Oily Water Separator and Generator compound.
Ravensthorpe Nickel
Non-Processing Infrastructure – all electrical works for the HMW Workshop & Domes, Administration Buildings, Wash Pad, Fuel Farm and Oily Water Separator.
Paddington Gold Mine
Pebble Crusher Circuit Upgrade at the Norton’s Paddington Gold Mine in Kalgoorlie.
Roy Hill Debottlenecking
Award Finalist Industrial Project of the Year in 2022 (pending Final Awards) Project consisted of all Electrical & Instrumentation works.
King of the Hill Gold Mine
Construction of Gold Mine completing all Electrical, Instrumentation, Communication and Fire works across the crushing, grinding, mill, leach & absorption, gold recovery, reagents, borefields and plant services areas.
Agnew Gold Mine Expansion Stage 1
Gold Fields and Lycopodium awarded the Electrical & Instrumentation package for its Agnew Gold Mine Expansion Project Stage 1 in May 2022. Works completed in late August 2022.
Karlawinda Gold Mine
Karlawinda Gold Mine 320 person camp.
Thunderbox Gold Mine
Supply labour and materials for the electrical, instrumentation, communications & air conditioning for the new Gravity Circuit Upgrade.
Monsignor Hawes Heritage Centre
Restoration, Conservation and Enhancement for the Twenty-First Century and beyond.
Midwest Port Authority CV03 & CV04 Conveyor Upgrade
Supply labour and materials for the upgrade of CV03 & CV04 at Midwest Ports, Geraldton.
Kalbarri Beach Resort
Kalbarri Beach Resort Electrical Upgrade
Lloyds Commercial Building
Commercial Re-development of the existing Lloyds Commercial Building. Premises consists of main entrance foyer, 6 x tenancies & public toilets with-in the complex. Project started 1/07/2019 and was completed 30/04/2020.
Blue Bird Camp HV Power Upgrade
Camp power supply upgrade.
Blue Bird Secondary Crusher
Supply labour and materials for the new Secondary Crusher/Screen E&I at Blue Bird Gold Mine.
Gruyere Gold Mine
Supply labour and materials for the electrical, communication new Gruyere Gold Contractors Workshop/Sheds/Yard & Administration.
Iluka Resources Cataby Mineral Sands Project
Construction of the Second Concentrator building, Process Water, Clean Water, Thickeners 1 & 2, Flocculant Mixing Area, HV LV wash down bays and Return Water.
Wiluna Shire Offices
Commercial development of the existing Wiluna Hotel Lloyds to the new Shire of Wiluna Council Offices. Premises consists of council chambers, administration offices and commercial kitchen/function room. Project started 1/11/2017 and was completed 30/08/2018.