MWPA CV03 & CV04 Conveyor Upgrade

MWPA CV03 & CV04 Conveyor Upgrade

Marine & Civil Pty. Ltd.

2016

Midwest Ports, Geraldton

$0.891m

Work was carried out in conjunction with the upgrade to the existing ship loader.

  • The work included the following;
  • Supply & installation of the cable ladder system.
  • Supply & installation of the electrical, control and instrumentation cabling.
  • Supply & installation of the control and instrumentation equipment.
  • Supply & installation of the light and power.
  • Dry & wet testing and commissioning.
No Comments

Sorry, the comment form is closed at this time.