Iluka Resources Cataby Mineral Sands Project

Iluka Resources Cataby Mineral Sands Project

DIAB Engineering

2018 – 2019

Cataby WA

$5.86m

As part of Iluka Resources Ltd $275m Cataby Mineral Sands project, we were awarded two electrical packages which included:

  • The dismantle/disconnection of the Eneabba Wet Concentrator plant electrical apparatus (all field motors/instruments/switch rooms).
  • The re-erection of the Eneabba Wet Concentrator plant Electrical apparatus.
  • Installation of a 11kV Power Line.
  • Installation of 12.5mVa substation.
  • The installation of field lighting and general power.
  • The installation of field cabling (Communication / LV / HV / Earthing / Instrumentation).
  • The installation of field Instrumentation (Analogue / Digital / Telemetry Instruments).
  • PLC Wiring Changes.
  • HV Terminations.
  • Dry and Wet commissioning